ENGINEERING DESIGN OF PETROCHEMICAL PLANTS 

 

Name of Construction Facility

(Design & Survey Works)

Design Stage

Client

Design Works Finalization

POLIEF PTA Revamp

Detailed Engineering

АО POLIEF

nowadays

Construction of  Е-ВА-116,117 Pyrolysis Furnaces  

 

Engineering Surveys & Environmental Study

 

PAO Nizhnekamskneftekhim

2016

Replacement of 1,2 ТМ-304 Driers for AO POLIEF

Pre-Project Study &

Summary Cost Estimate  

 

АО POLIEF

2016

POLIEF PTA Revamp

  Engineering Surveys 

Project Documentation

АО POLIEF

2016

 

Revamp of 37 500 t/y Linear Alpha-Olefins Plant Using Alpha-Sablin Technology at ОАО Nizhnekamskneftekhim

 

Engineering Surveys

Project Documentation 

Detailed Engineering

ОАО Nizhnekamskneftekhim

2016

Extension of БК-8 Store at Yuzhnaya Marketable Products & Raw Materials Storage Facility with Construction of Additional Group  of Storage Tanks and Railway Propylene  Loading/Unloading Rack for ООО Tobolsk-Polymer

 

Project Documentation

Detailed Engineering 

Construction Design Supervision

ООО Tobolsk-Polymer

2014

60 KTA IIR Plant Construction

 

Basic Engineering Design

Lanzhou GPRO Petrochemical Co., Ltd. (LGPC), People’s Republic of China

2013

TAF Project for Ammonia, Methanol and Carbamide Production at Site of OAO AMMONII, Mendeleevsk, the Republic of Tatarstan:

-Architectural & Civil/Structural;

-Instrumentation;

-HVAC;

-Plot Plan

 

Detailed Engineering

Sojiz Corporation, Japan

2013

50 KTA Polystyrene Plant, the 4th Stage

Project Documentation

Detailed Engineering

Geological Engineering & Geodetic Engineering Surveys

 

ОАО  Nizhnekamskneftekhim

2013

 

Construction of New 100 KTA IIR Plant in Jamnagar, India

 

Basic Engineering Design

ООО NIOST

2012

Technical Re-equipment of Butadiene Plant with Uprating to 207 KTA in Terms of Marketable Butadiene

 

TEO, Detailed Engineering 

ОАО Sibur-Holding

2011

Modernization of БК-2 Isobutane Dehydrogenation Shop with Capacity Uprating to 185 KTA in Terms of 100% at ООО Tobolsk-Neftekhim

 

Detailed Engineering

ООО Tobolsk-Neftekhim

2010

100 KTA Expandable Polystyrene Plant (1 & 2 Stages)

 

Project Documentation

Detailed Engineering

ZAO Sibur-Khimprom

2010

Unit of Propane Fraction Treatment from Methanol at ООО  Tobolsk-Neftekhim

 

TEOI,  Project Documentation

 

ООО  Tobolsk-Neftekhim

2010

Butadiene Plant – DBO-2 Shop (Butane Dehydrogenation Section)

 

Detailed Engineering

ООО  Nizhnekamskneftekhim

2010

20 KTA Novolac Resins Plant and 15 KTA Pulverbakelite Plant

 

Project Documentation

Detailed Engineering

ОАО Karbolit

2009

IIR and HIIR Plant. The 6-th and 7-th System of Polymerization – Stripping of IIR and HIIR Plant. Welding-2 Finishing Line

 

Engineering Surveys

Detailed Engineering

ОАО Nizhnekamskneftekhim

2009

450 KTA Methanol Plant. Methanol Stores

 

Detailed Engineering

ООО Shchokinoazot

2008

Construction Site of 500 KTA Propylene and Polypropylene Plant and Auxiliary OSBL Facilities

Engineering Surveys

ООО Tobolsk-Polymer

2008