2016

In the period from 28.03.2016 to 02.04.2016 for OOO GSE-Giprokauchuk in China visit of purified terephthalic acid (PTA) plants was arranged for familiarization with operation of PTA production plants, these plants retrofit experience as well as with filtration equipment operation experience.