ENGINEERING DESIGN OF PETROCHEMICAL PLANTS
Name of Construction Facility (Design & Survey Works) |
Design Stage |
Client |
Design Works Finalization |
POLIEF PTA Revamp |
Detailed Engineering |
АО POLIEF |
nowadays |
Construction of Е-ВА-116,117 Pyrolysis Furnaces |
Engineering Surveys & Environmental Study
|
PAO Nizhnekamskneftekhim |
2016 |
Replacement of 1,2 ТМ-304 Driers for AO POLIEF |
Pre-Project Study & Summary Cost Estimate
|
АО POLIEF |
2016 |
POLIEF PTA Revamp |
Engineering Surveys Project Documentation |
АО POLIEF |
2016 |
Revamp of 37 500 t/y Linear Alpha-Olefins Plant Using Alpha-Sablin Technology at ОАО Nizhnekamskneftekhim
|
Engineering Surveys Project Documentation Detailed Engineering |
ОАО Nizhnekamskneftekhim |
2016 |
Extension of БК-8 Store at Yuzhnaya Marketable Products & Raw Materials Storage Facility with Construction of Additional Group of Storage Tanks and Railway Propylene Loading/Unloading Rack for ООО Tobolsk-Polymer
|
Project Documentation Detailed Engineering Construction Design Supervision |
ООО Tobolsk-Polymer |
2014 |
60 KTA IIR Plant Construction
|
Basic Engineering Design |
Lanzhou GPRO Petrochemical Co., Ltd. (LGPC), People’s Republic of China |
2013 |
TAF Project for Ammonia, Methanol and Carbamide Production at Site of OAO AMMONII, Mendeleevsk, the Republic of Tatarstan: -Architectural & Civil/Structural; -Instrumentation; -HVAC; -Plot Plan
|
Detailed Engineering |
Sojiz Corporation, Japan |
2013 |
50 KTA Polystyrene Plant, the 4th Stage |
Project Documentation Detailed Engineering Geological Engineering & Geodetic Engineering Surveys
|
ОАО Nizhnekamskneftekhim |
2013 |
Construction of New 100 KTA IIR Plant in Jamnagar, India
|
Basic Engineering Design |
ООО NIOST |
2012 |
Technical Re-equipment of Butadiene Plant with Uprating to 207 KTA in Terms of Marketable Butadiene
|
TEO, Detailed Engineering |
ОАО Sibur-Holding |
2011 |
Modernization of БК-2 Isobutane Dehydrogenation Shop with Capacity Uprating to 185 KTA in Terms of 100% at ООО Tobolsk-Neftekhim
|
Detailed Engineering |
ООО Tobolsk-Neftekhim |
2010 |
100 KTA Expandable Polystyrene Plant (1 & 2 Stages)
|
Project Documentation Detailed Engineering |
ZAO Sibur-Khimprom |
2010 |
Unit of Propane Fraction Treatment from Methanol at ООО Tobolsk-Neftekhim
|
TEOI, Project Documentation
|
ООО Tobolsk-Neftekhim |
2010 |
Butadiene Plant – DBO-2 Shop (Butane Dehydrogenation Section)
|
Detailed Engineering |
ООО Nizhnekamskneftekhim |
2010 |
20 KTA Novolac Resins Plant and 15 KTA Pulverbakelite Plant
|
Project Documentation Detailed Engineering |
ОАО Karbolit |
2009 |
IIR and HIIR Plant. The 6-th and 7-th System of Polymerization – Stripping of IIR and HIIR Plant. Welding-2 Finishing Line
|
Engineering Surveys Detailed Engineering |
ОАО Nizhnekamskneftekhim |
2009 |
450 KTA Methanol Plant. Methanol Stores
|
Detailed Engineering |
ООО Shchokinoazot |
2008 |
Construction Site of 500 KTA Propylene and Polypropylene Plant and Auxiliary OSBL Facilities |
Engineering Surveys |
ООО Tobolsk-Polymer |
2008 |